www.mymanatee.org
Manatee County Government Administrative Center Commission Chambers, First Floor 9:00 a.m. - May 6, 2014
REVISED May 6, 2014 - Regular Meeting
Agenda Item #16


Subject
Work Assignment #27 with Carollo Engineers, Inc., for Preliminary Design, Final Design, and Construction Phase Services for the Lake Manatee Waste Treatment Plant Filter Upgrade

Briefings
None

Contact and/or Presenter Information

Contact:  Frank Lambertson, Purchasing Division, Ext. 3042.

Presenters:  Brian Bates, P.E, Project Engineer, Ext. 7329, and Jeff Strietmatter, P.E., Project Management Division Manager, Ext. 7335.



Action Requested
Authorization for the County Administrator, or his designee, to execute Work Assignment #27 pursuant to Agreement 11-1569BG: Utilities Engineer of Record Services with Carollo Engineers, Inc., Sarasota, FL, for Professional Engineering Services to provide Preliminary Design, Final Design, and Construction Phase Services for the Lake Manatee Water Treatment Plant Filter for a total amount of $4,885,785.00.

Enabling/Regulating Authority
Manatee County Code of Laws

Background Discussion

The Lake Manatee Water Treatment Plant includes a conventional surface water treatment train comprising coagulation, flocculation, sedimentation, and filtration.  The multi-media filters are at the end of their useful life and need to be refurbished or replaced with another treatment process.

In 2008, the County undertook pilot tests that included evaluation of several treatment alternatives and, based on the results of the treatment and economic evaluations, an ultra filtration system was proposed to retrofit the existing media filters.

In 2010, a peer review of a Basis Of Design Report (BODR) for the ultra filtration was prepared for the County.  The peer review included evaluating the BODR in detail with respect to technical requirements, cost aspects, facility layouts, and project delivery methods. 

Currently Carollo Engineers, Inc., is working with the County to select a hydraulic configuration (submerged or pressure) of the ultra filtration membrane that is best suited for retrofit of the existing facilities.  The scope of work to be provided describes the professional services associated with the preliminary and final design, membrane procurement, membrane supplier bid evaluation/pilot testing, permitting, general contractor selection, bidding, construction, start-up, and the warranty phase.

On November 8, 2011, the County approved the Agreement with Carollo Engineers, Inc., of Sarasota, FL, to provide Utilities Engineer of Record Services.  This Agreement has been extended twice and is effective until  November 13, 2014.  Two (2) additional one-year extensions remain.



County Attorney Review
Not Reviewed (No apparent legal issues)

Explanation of Other


Reviewing Attorney
N/A

Instructions to Board Records

Original to Board Records.

Copies to:

Carollo Engineers, Inc., 401 N. Cattleman Rd., STE 306, Sarasota, FL 34233 (rcushing@carollo.com).

Debbie Marchbank (debbie.marchbank@mymanatee.org) and Brian Bates (brian.bates@mymanatee.org), Public Works Department; Frank Lambertson (frank.lambertson@mymanatee.org), Purchasing Division.



Cost and Funds Source Account Number and Name
The funding source for this Work Assignment is 404 6050470 531000 WTP: Ultra Filtration System $1,200,000; FY 15 CIP $3,685,785

Amount and Frequency of Recurring Costs
N/A


Attachment:  Work Assignment 27 - April 9 Memo.pdf
Attachment:  Work Assignment 27 with Carollo.pdf
Attachment:  Work Assignment 27 - 2011 Agmt with Carollo.pdf