Subject
PDR-13-28(P) - Long Bar Pointe, Phase 1, Parcels C and B2 - DTS20130220 - Quasi-Judicial - Shelley Hamilton - Continued from February 6, 2014, and readvertised

Briefings
Briefing Provided Upon Request

Contact and/or Presenter Information

Shelley Hamilton
Principal Planner
941-748-4501, ext. 6863



Action Requested

RECOMMENDED MOTION:

Based upon the staff report, evidence presented, comments made at the Public Hearing, the action of the Planning Commission, and finding the request to be CONSISTENT with the Manatee County Comprehensive Plan and the Manatee County Land Development Code, as conditioned herein, I move to ADOPT Manatee County Ordinance No. PDR-13-28(P); APPROVE the Preliminary Site Plan with Stipulations #A.1 - A.5, B.1, C.1 & C.2, D.1 - D.7, and E.1; ADOPT the Findings of Special Approval for a development:  1) adjacent to a perennial lake or stream; 2) being placed within a portion of the CHHA (Coastal High Hazard) Overlay District; and 3) being placed within a portion of the CEA (Coastal Evacuation Area) Overlay; and ADOPT the Findings for Specific Approval for: 1) an alternative to LDC Section 714.8.7 of the Land Development Code to allow the installation of smaller diameter trees; 2) an alternative to LDC Section 715.3.4 to allow one canopy tree per lot frontage instead of one tree per 50 linear feet; 3) an alternative to LDC Sections 712.3 and 740.2.6.17 to allow primary access to be provided to certain lots from a 20’ wide alleyway; and 4) an alternative to the width of an alley; as recommended by Planning Commission.

Commissioner Chappie



Enabling/Regulating Authority

Manatee County Comprehensive Plan

Manatee County Land Development Code



Background Discussion
  • The subject property contains 61.75 + acres located southwesterly of El Conquistador Parkway and approximately 1.75 miles west of 34th Street West in Bradenton.
  • The property is designated RES-9 on the Future Land Use Map.
  • The property is zoned PDR (Planned Development Residential) and a Preliminary Site Plan for 200 single family detached lots is being considered.
  • The 200 single family detached units equates to a gross density of 3.24 du/acre and a net density of 3.30 du/acre.
  • There is a provision of 34.49% open space and 2.79 acres + of recreational area.
  • Two access points to El Conquistador Parkway are anticipated.
  • The site is in an “A-15” Flood Zone.
  • Water and Sanitary Sewer will be provided and are located on El Conquistador Parkway.
  • Specific Approvals have been requested:
    •  To allow installation of smaller trees;
    • To allow installation of one canopy tree per lot frontage instead of one tree per linear feet
    • To allow primary access to certain lots from an alleyway; and
    • To allow a 20’ wide alleyway.
  • Special Approvals have been requested:
    • To allow a development adjacent to a perennial lake or stream;
    •  To allow development within a portion of the CHHA (Coastal High Hazard Area) Overlay; and
    • To allow development within a CEA (Coastal Evacuation Area) Overlay.
  • A mutually acceptable agreement to relocate an existing pond for El Conquistador Parkway improvement into the project will also be considered by the Board of County Commissioners at the same meeting.
  • Staff recommends approval with stipulations.
  • On January 16, 2014, by a vote of 7 – 0, the Planning Commission recommended approval.
  • A summary of the public comments heard at the January 16, 2014, Planning Commission public hearing are in the staff report attached to this memo.


County Attorney Review
Other (Requires explanation in field below)

Explanation of Other
William Clague reviewed and responded by email on December 19, 2013.

Reviewing Attorney
Clague

Instructions to Board Records
Please forward a copy of the executed document to bobbi.roy@mymanatee.org

Cost and Funds Source Account Number and Name
n/a

Amount and Frequency of Recurring Costs
n/a


Attachment:  Maps - Long Bar Pointe, Phase 1, Parcels C and B2 - PDR-13-28(P) - 2-25-14 BC.pdf
Attachment:  Graphic demonstrating existing approvals - Long Bar Pointe, Phase 1, Parcels C and B2 - PDR-13-28(P) - 2-25-14 BC.pdf
Attachment:  Requests for Specific and Special Approval - Long Bar Pointe Phase 1 Parcels C and B2 - PDR-13-28(P) - 2-25-14 BC.pdf
Attachment:  Copy of Newspaper Advertising - Long Bar Pointe, Phase 1, Parcels C and B2 - PDR-13-28(P) - 2-25-14 BC.pdf
Attachment:  Ordinance - Long Bar Pointe, Phase 1 Parcels C and B2 - PDR-13-28(P) - 2-6-14 BC.pdf
Attachment:  Public Comments - Long Bar Pointe, Phase 1, Parcels C and B2 - PDR-13-28(P) - 2-25-14 BC.pdf
Attachment:  Revised Site plan (new aerial) Long Bar Pointe - PDR-13-28(P) 2-25-14 BC.pdf
Attachment:  Slideshow - Planner - Long Bar Pointe Phase 1, Parcels C and B2 - PDR-13-28(P) - 2-25-14 BC.pdf
Attachment:  Staff Report - PDR-13-28(P) - Long Bar Pointe, Phase I, Parcels C and B2 - 2-25-14 BC.pdf